Define the times of an operating procedure with BASIC MOST®

Define the times of an operating procedure with BASIC MOST®

 The MOST® methodology, developed by Cabinet Maynard, now accenture – Pittsburgh USA, is the most powerful timing tool on the market

- adapted to today's organizations: FAST, RELIABLE

- recognized worldwide by industry (diploma) for costing both existing and new products

Contenu de la formation

BASIC MOST® methodology: General moves / Controlled move / Tools sequence

DAYS 1 to 4

  • Introduction to time determination :
- The different determination techniques
- The place of MOST® and the evolution of MTM

  • MOST® technology concept :
- Statistical groupings
- Different types of object movement
- Choice of difficulty-related cues

  • Predetermined sequences :
- Sequence structure (phases, parameters, indices)
- General move
- Controlled move
- Tools sequence

        --> Case study

  •  MOST® analysis on existing or simulated activity
- Data preparation
- Identification of operations to be carried out

        --> applications using video


      Inter-session application

      Each participant carries out a study on one of his or her company's products, in the spirit of the MOST approach.


      Additional training - Presentation and correction of costings - BASIC MOST® final exam

      DAYS 5 to 6

      • Theorical complements
      - Index ranges
      - Time and the compensation effect
      - MOST® precision

      • Specific tables
      - The mathematical expression of activity
      - Determining the corresponding index ranges

            --> Case study


      • Presentation and correction of the costings produced during the inter-session by each trainee:
      - Presentation to the group of the video of the study carried out by each trainee
      - Figures for activities presented
      - Checking, refocusing by the presenter

      • Reviews
      - Theorical reviews
      - Sequences reviews

      • Final exam
      - Exam
      - Correction
      - Debriefing

      Objectifs

      • Acquire a methodology for determining times that will guarantee the reliability of method times and improve performance and rigor.
      • Determine workstation or process times using a database that is unique in the world (derived from the MTM experience of which MAYNARD was one of the founders).
      • Monitor changes in operating procedures in real time.
      • Continuously enrich your own database, which can communicate with financial control and Production Management.

      Public

      • Methods Managers and Technicians, whose main tasks are : 
        • Improve workstation productivity
        • Define and balance tasks on assembly lines
        • Costing new products
        • Defining range times
      •  This tool also enables designers of new production equipment to simulate several operating modes. In this way, they can measure the impact of their design choices on operator comfort.

       If you have a disability, please contact us.

      PREREQUISITES :

      Know the basics of job design

      Méthode pédagogique

      • theoretical and methodological input, enhanced by case studies,
      • group work to encourage discussion,
      • practical applications using video, and in the workplace.
        •  Preparation of a study on a real company case, to be presented on day 5
        • Final exam on day 6
      • On-the-spot evaluation of the training course by means of a questionnaire completed by the participant.
      • A course guide will be given to each participant at the start of the course.
      • A trainer available after the course to answer your questions.

      Les + de Cogite

       
      • OFFICIAL distributor accenture/Maynard
      • Quantification of cases proposed by participants in inter-session meetings
      • It support to make calculations more reliable, simplify them & save time

       MOST’S® advantages

      •  Worldwide recognition of participants' skills.
      • Detecting ergonomic risks
      • Identify productivity potential
      •  A priori costing (costing of optimal operating mode)